Wednesday, 10 October 2012

Calender

Calendar Schedule; OCTOBER

11th October -

Storyboarding completed, so that I am ready to pursue with filming. I will also be announcing my chosen actor - Fernando Rocha.

12th October -

Begin video shoot. Will drive to first location (Datchet car park) with Fernando and equipment to begin my film. During this time, I will be taking various shots of Fernando using his skateboard - performing numerous tricks and walking with the board in his hand. In the evening, I will be analysing existing music videos within the same genre and producing this as research on my blog.

13th October -

Second day of shooting. Will be driving to next location (Staines - Soverland Grove). At this location, I will be filming Fernando walking down the street. I will be performing over the shoulder shots and low/ high angles shots of him as he walks. At my third location; The Avenue, Wraysbury. I will be performing numerous dolly shots and tracking shots of Fernando as he runs down the street. This will be achieved through the use of my car; placing the camera out of the window as I drive along side him.

14th October -

Today, I will be travelling to my fourth location - Old Windsor Forest. At this location, I will be filming Fernando as he walks up the hill through various shots,  including; over the shoulder shots, medium shots, tracking shots and close- ups. Once this is completed, I will be analysing all my existing clips and removing the ones which are not worth keeping.

16th October -

Final day of filming. Today, I am filming the house scenes - at my own home. During this time, I will be asking Fernando to be performing the overdose scene - through the use of drugs and alcohol. This scene should take no longer than a hour to shoot.

18th October -

Ready to begin editing. This will be achieved through the use of Apples "Final Cut Pro".




No comments:

Post a Comment